Case Studies

Sainsburys Staplehurst

Location: Staplehurst
Duration: 10 weeks
Contract Value: £380K

Project Details:

  • Principle contractor role
  • Installation of all temporary fencing
  • Licensed and non-licensed asbestos removal
  • Strip out
  • Erection of demolition scaffold
  • Full demolition inclusive of breaking out ground floor slabs and foundations
  • Removal of underground tanks
  • Crushing of all masonry material on site for clients reuse
  • All remaining waste removed and recycled off site

Ferrari demolition were awarded the contract for full demolition of existing warehouses and offices.

Ferrari Demolition successfully handed this project over to the client with no complication and ahead of programme allowing the client to proceed quickly on to groundworks.

Sainsburys Gillingham

Location: Gillingham
Duration: 40 weeks
Contract Value: £900K

Project Details:

  • Asbestos Removal
  • Full strip out
  • Demolition of 9M high block walls
  • Demolition of concrete roofs
  • Circa 6000m2 Screed removal
  • Dismantling of Mezzanines
  • Passenger and goods lift decommissioning & removal
  • M&E Strip out
  • Plant room strip out
  • Demolition of R.C stair cores
  • Creating apertures through R.C slabs for lift and escalator installation
  • R.C slabs thickness reduction
  • Forming of structural openings
  • All Materials removed from site

Ferrari Demolition were tasked with the above scope. All works where carried out within in a live store and was carried out around the clock. With scope – methods and tasks every changing Ferrari’s dedication – reactiveness – and exceptional team effort meant that this project was delivered on time with an absolute minimal disturbance to the store and centre.

Tower 42 – London

Location: London
Duration: 2 weeks
Contract Value: £30K

Project Details:

  • Full strip out
  • M&E Strip out
  • Protection of surrounding areas
  • All waste removed from site

Ferrari Demolition carried out the strip out out of normal working hours to an office space whilst retaining live services with no issues. The team gained a fantastic relationship with centre management and all waste was removed around the clock to allow other deliveries take place with interruptions.

Channing Junior School

Location: London
Duration: 6 weeks
Contract Value: £45K

Project Details:

  • Strip out of existing school building
  • Reclaimation and setting aside of original features
  • Hand demolition of timber roof
  • Hand demolition of upper timber floors and steel work
  • Hand demolition of external walls
  • All waste removed from site.

Ferrari Demolition carried out the careful partial hand demolition / alterations of an exisiting school building. The works were extremely sensitive given it was a live school. With years and years of add ons / alterations and roof replacments meant that Ferrari had to be extremely reactive to an every changing working sequence. Ferrari successfully carried out the works and handed the building back to the main contractor which gave them a running start with other trades.

Cannon Street – London

Location: London
Duration: 14 weeks
Contract Value: £240K

Project Details:

  • Full strip out
  • M&E Strip out
  • Plant rooms removal
  • Structural openings
  • Lift decommissioning and removal
  • All waste removed from site

Ferrari Demolition were set the task of carrying out a full soft strip of over 6 floors to an existing office block with an extremely tight programme. All works carried out around the clock ensuring that the site was handed back to ensure a swift start on the fit out team.

Tavistock Square – London

Location: London
Duration: 15 weeks
Contract Value: £80K

Project Details:

  • Asbestos removal
  • Full strip out
  • M&E Strip out
  • Structural openings
  • All waste removed from site

 

Tavistock Square project required a small but dedicated team that could work to ensure that all areas where swiftly stripped out and handed back to the fit out team to allow areas to be re opened in very small time scales.

Wimbledon High School Phase 1

Location: London
Duration: 4 weeks
Contract Value: £50K

Project Details:

  • Asbestos removal
  • Strip out
  • Erection of full demolition scaffold
  • Diamond cutting
  • Demolition of stair core
  • Forming of structural openings
  • Demolition of walls
  • All waste removed from site

 

Ferrari Demolition carried out all works mentioned above to a live school. Methods were carried out to omit a disturbance to the school. These works were carried out to the highest possible standard with no complaints or issues. Site was handed back ahead of programme.

Contact

Call Us:
0208 942 6787


Email:
info@ferraridemolition.co.uk

Services

Demolition
Strip out
Cut and carve
Site clearance
Plant hire
Asbestos removal
Recycling 
…and all associated works